07 April 2010

Finally, an update again!





The timber has finally arrived, a couple of weeks behind schedule, but we have utilised the time well and are still on track for the opening on July 1st)! The pictures here show the progress we made in only one day.

During the past weeks we have also cleaned up the mess created by the concrete works (and a big mess it was), afterwards we continued planting and landscaping (it all is starting to take shape)!

By the way, our NEW WEBSITE is also taking shape at the moment and we expect that it will go live on (or before) April 19th! As promised, with a relocation special offer!

28 February 2010

Fales are being moved!



Foundations and concrete walls are now 95% done!





All foundations and brick walls are at this stage ready enough for the buildings at our old location (Tofoa) to be moved here! Temporary telephone line, electricity and water have now also been connected, finally!

Cyclone Rene caused only minor delays, due to a temporary power outage on the westcoast, but we were pleased that there was absolutely no damage to trees, buildings and equiptment at the new and the old site!

Pictures:
Top: Restaurant
Center: Standard room complex
Bottom: Fales (bungalows)

31 January 2010

Two weeks later... and making good progress!








Two weeks have now passed since the first construction began!
The weather has been exceptionally dry and sunny for this time of year, resulting in very good construction progress.

The excellent holiday and construction weather however also meant that further planting had to be minimized until there is a reasonable amount of rain!

If all goes well, week three will see the installation of water, telephone and a temporary electricity terminal, as well as several foundations completed with slaps.

Pictures explained (from top):

1. Some minor planting continues.

2. The restaurant foundation is ready for the gravel filling to arrive.

3. The restaurants filling has arrived and has already been leveled and compacted.

4. All ten bungalow foundations are ready for filling and two have already arrived.

19 January 2010

The construction begins... Finally!








After another month of further preparations, the building has finally begun! The pictures below show some of the progress made in the first two days, and if the weather stays dry (we have not been having much of a wet season so far), we should be able to progress quite well. After so many months of satisfying bureaucracy, everyone is extremely excited to finally see the building process in full swing!

Pictures explained (From the top):

The "first" picture shows the initial positioning of the Restaurant building, using concrete blocks.

In the "second" picture you see the Contractor/Supervising carpenter measuring the exact location and hight of the foundations.

In picture "three" you can see the Restaurant foundation after the measurements and foundation preparations (including steel reinforcements) have been completed and the first few foundation brick have been placed.

The final picture "four" shows the private residence foundation at an already slightly more advance stage!

If all goes well from here, there will be more noticeable progress (more often) and this blog will hopefully be updated more frequently from now on, enjoy!!!

28 November 2009

November Update!

The fence is done and the foundation bricks have been delivered as well. See picture for safe Island style brick stacking... they have been re-stacked by the way ;-)! For the past month we have been busy clearing old tree trunks and roots from foundation locations as well as from areas were trenches will need to be dug for the electricity and water pipes. If all goes well, construction will commence in a couple of weeks. We have so far been provided with all (but one) Ministerial Go aheads for the project!

14 October 2009

New rates after relocation and the issue of distance?

Many visitors have expressed their concern over the past few months, that with our move to the beach, our rates would surely increase significantly.

This message is to assure all our former and future guests, that our rates have never been based on what can be charged for a product but what needs to be charged for a product in order to operate and maintain the facility! Indeed, there possibly may be an increase, but this will be marginal, depending on any increase in operating costs due to transportation (i.e. free international inbound airport pick up "with almost twice the distance") as well as trips to and from town!

By the way, we are planning in several convenient and low cost options for getting around on Tongatapu, so that the remote location of Ha'atafu Beach Reserve will never be an issue! More info on these will be available in early 2010!

Hope you enjoy the Blog!
.

11 October 2009

Border fence work in progress.




The work on the border fence is now well under way and the pictures show the stages:

* Fence path clearing
* Post hole digging

Make sure you visit the blog again soon, as the progress is now gaining (Island style) momentum.

01 October 2009

Access road is completed and the project is moving forward, finally!!!





Another month has past and in comparison to the last half year... a lot has happened!

The building of the access road is complete, the excavator from New Zealand (for the trenching work) has arrived and the construction of the border fence has started.

An update on the fence work will follow as soon as the pictures are ready.

01 September 2009

Artist's 3D Impression

The First draft of the Artists 3D Impression is ready, note though that only the "already existing" trees and plants are actually included in the drawing at this point. The botanical gardens that are to be moved from the current location are proving to be a bit of a challenge to the artist!
The Road construction has now also begun and a post on this will follow shortly so please visit the blog again real soon!